project

Care and Preservation Facility.

Camp Arifjan, Kuwait
EARLY COMPLETION
Project Number:

W912ER-19-C-0018

Type:

Vertical Construction

Project Completion Date:

Jul 17, 2022

Contract Value:

USD $25.8M

Manhours:

578,230

Total Built-up Area:

7,257m2 Parking Canopy: 230m2 Paint Kitchen Canopy: 18m2 Compressor and Storage: 32m2

Narrative on
Experience:

Narrative on Experience:

The project is a D-B-B project with some D-B scope such as the fire protection system, PEB structures, paint booth, and the blast booth inside the Care and Preservation Facility (CPF). The CPF facility includes a paint bay, sandblast bay, welding bay, storage, administration space, and other support functions. Other primary facilities include plant and utility buildings, hardstand, and redundant power capability. Supporting facilities include site development, utilities (including connections), security devices, lighting, paving, walks, curbs and gutters, storm drainage, fencing, and signage. Interior of Maintenance Areas & Corrosion Control Center has painted steel structure, walls, and ceiling.

This project is a vehicle maintenance facility designed to provide maintenance work for trucks, tanks, and similar extensive military equipment. The building has 21 universal maintenance bays, four units of a 35-ton bridge crane, and corrosion control structures.

MVL Group Global Office
2722 E Michigan AVE STE 209, Lansing, Michigan 48912-4005

Regional Offices
  • United States: 2722 E Michigan AVE STE 209, Lansing, Michigan 48912-4005
  • Europe: Oxford Road, Uxbridge, Middlesex, UB8 1HR,UK
  • Middle East: One Lake Plaza 1802, Jumeirah Lake Towers, Dubai, UAE
  • Asia: 585 Zukeran Kitanakagusuku-son Okinawa,Japan